INGERSOL SELVARAJ

Project Engineer / Product Development
Bachelor’s Degree in Mechanical Engineering

Phone: +47 46249046

E-mail: ingersol.s@outlook.com

EDUCATION:

SKILLS:

SOFTWARE PROFICIENCY

EMPLOYMENT HISTORY

EQUIPMENT DESIGNED

Bow Loading System (BLS), Submerged Turret Production (STP), Bop Trolley, Bop Skid Continuous, Bop Moonpool Skid, Utility Handling Tool (UHT), Pipe Tail-In Arm, Bop Bulkhead Seafixing, LMRP Bulkhead Seafixing, Underhull Guide System, Service, and Access Basket (SAB), Fingerboard Latches, Multipurpose Handling Skid, X-Mas Tree Elevator, Trolley, X-Mas Tree Skid, Above Deck Guide, Catwalk Machine (CWM), Noiseless Fingerboard.

PRODUCT KNOWLEDGE

Platforms, Pipe Support, Gratings, Bushing, Buffer, Handrails, Ladder, Drag Chain, Welding, Lifting, Transportation, Drops, Safety, Rollers, Gear Box, Rack, Pinion, Signs, Bolts, Sheaves, Wire Rope, Sensors, Material, Rings, Shafts & Couplings, Lifting Lugs, Shackle, Slew Drive, Hydraulic Cylinder, Painting, Proportional Valve, Hoses & Fittings, Control Console, Remote Controls, Alarms & Lights.

PERSONAL DETAILS

EXPERIENCE DETAILS:

Project Engineer - NOV APL Arendal (Sep 2008 - Present)

Design Engineer - FMC Technologies Kongsberg, Norway (Apr 2005 - Aug 2008)

Design Engineer - R&D, L&T-Demag Plastics Machinery, Chennai, India (Sep 2003 - Apr 2005)

CAD Engineer - Creations & Communications, Chennai, India (Jun 2002 - Sep 2003)

CERTIFICATIONS

Autodesk Inventor, AVEVA E3D, Anti-Corruption, Antitrust, Antivirus Malware Protection, Export Controls, Foreign Corrupt Practices Act, Hazard Identification, Safety 24/7, Global Travel And Business Expense Policy, Mobile Device Management Notice, Personal Protective Equipment (PPE), Business Conduct And Ethical Standards, Dropped Object Prevention Program, Employee-Owned Personal Devices Policy, Safe Use Of Lifting Equipment, Secondary Retention, Slips, Trips, And Falls, Stop Work Authority, Teamcenter Training, Human Trafficking, Chemical Safety, Non-Harassment Work Environment, Global Companies Imports And Customs Compliance.

NOTICE PERIOD : 2 weeks, negotiable

REFERENCES : Available upon request